Specifications
GeoDome Theater Installation and Operation Guide
Packing Up
1. Drag dome by suction fan hole until it folds in half along a line between the doorway and
the inflation tube. This sandwiches the screen completely inside the outer shell, protecting
it from dirt.
2. Once deflated, flip the dome so that the light screen surface is up (away from dirt and
debris).
3. Orient the dome with doorway and inflation tube opposite each other and fold one side
(90 degrees from the door or inflation tube) over the other making a half circular shape.
4. Fold in half again from the opposite direction so that the width is again decreased.
5. Begin “tightly” and “slowly” rolling the dome from the doorway end toward the inflation
tube end taking time to let air escape as you roll.
6. Place the dome in the transport bag and tighten the bag straps before transport.
www.elumenati.com Page 15
(Fig. 17) Drag dome by suction fan hole
(Fig. 18) Folding dome to proper width
(Fig. 19) Folding dome to proper width
(Fig. 20) Dome cinched into protective bad










