Specifications

Chapter 8 – PL Smart Transceiver Programming
214 PL 3120/PL 3150/ PL 3170 Power Line Smart Transceiver Data Boo
k
Transceiver. If a production line is capable of producing one completed device every 10 seconds, then 3 NodeLoad
stations will be required to keep up with the production volume. Isolators will be required at each NodeLoad station to
prevent communication from occurring between stations. See the Power Line Test Isolator section in Chapter 7 for
details on how to build your own isolator.