Specifications
USER’S HANDBOOK
4. OPERATION
The STB-06-A test bench is designed to operate on shop External Power Supply or autonomously
(Internal Power Supply made by a battery pack).
The STB-06-LA test bench is designed to operate on External Power Supply only.
These test benches can remain in storage for few weeks without being recharged.
A. External Power Supply operation
The STB-06-A
test bench External Power Supply can operate with voltages between 100 V and 240 V,
50 Hz or 60 Hz. Power consumption is lower than 1 A.
Fully charging the battery takes approximately 5 hours (nominal).
B. Returning to service after long-duration storage
Long-duration storage causes full discharge of batteries. Fast charging of the computer battery and the
T
est Interface Device are necessary.
For charging:
- Connect the External Power supply adapters of each part directly to the relevant external power
supply input.
- Charge the test bench assembly for approximately 5 hours.
Note: The nominal battery capacity is only achieved after several complete recharging /
discharging Cycles.
Note: The test bench may be used immediately if it remains connected to external power supply.
Page 22
Mar
. 08/12










