User's Manual
SRP OPERATION CHAPTER 3
Page 16 Short Range Programmer VRT—User Guide
P/N 52806T100 Rev 1 April 2003
•
AMCO Automated Systems
Charging Batteries
The SRP batteries typically deliver between 2.0 volts and (when fully
charged) 2.6 volts If the voltage drops near 2.0 (as shown on the power-
on screen), you should recharge the batteries.
Battery charger. A 6 volt external power supply allows you to recharge
the internal batteries by connecting the SRP to the charger and plugging
the charger into a standard 120 VAC outlet. The SRP can be operated
while it is charging if needed to troubleshoot transponders in the shop.
CAUTION: When the battery is completely dead, it may take up to 15
minutes on charge before the unit will resume operation.
Battery charger.
Plug into 120 VAC
wall outlet
Connect charger jack
to
po
r
t
o
n
S
RP