Installation Instructions
4 While holding the assembly against the meter, gently try to turn the drive wheel clockwise and then counterclockwise.
- If the drive wheel meets resistance in both directions, it is properly mated. Continue withStep 5.
- If it meets no resistance in either direction & can freely rotate 360 degrees, then make sure the meter is completely free
of old gasket material then forcefully press the module on to the meter. Repeat Step 4. If the unit still doesn’t correctly
engage with the meter, return the unit to Honeywell Smart Energy.
5 While holding the module firmly in place so that you don’t lose wriggler alignment, place the index cover & cover gasket
onto the module/index assembly. Make sure the index cover is properly positioned with its vent holes at the bottom.
6 Using the appropriate mounting bolts, screw the module/index/cover assembly to the meter and tighten the bolts using a
torque driver. Set the torque driver to 20 in-lbs (± 4 in-lbs tolerance) to secure the assembly to the meter.
7 Install the tamper seals into the index cover receptacles.
PROGRAMMING THE MODULE
Although modules may contain default or utility-specified values that are programmed during manufacturing it is important to
program certain data after the module has been installed in the field. Programming should be performed even if the index is set
to 0000. Follow the instructions in the Connexo FieldSense Installer documentation. When prompted to hold a magnet on the
RTM unit, see for the location.
Preliminary