User Manual
APPENDIX
Page 24 EnergyAxis Gas Module ― User Guide
Elster Integrated Solutions • Draft A Nov. 2007
Equipment & Materials
• Replacement seals
Pulser Installation (Meter-mount)
NOTE: Although this section illustrates installation of the 5 ft pulser
board, the procedure is essentially the same for the 10 ft pulser
board.
1. Remove the index box from the meter.
• If the meter index box has a back cover, remove the 2
screws that secure it first.
• Remove the screws securing the index box to the meter.
• Save all screws.
2. Remove the 2 screws that secure the index to the index box.
• Save the screws.
Remove back cover of
index box first
(if applicable).
Then remove index
box from meter.