Specifications
July 2010
BLACKBOX PORTABLE QUICK REFERENCE GUIDE
III—10
On Site Setup | Elspec
Step 5: Verify the Measurement Readings
In order to ensure the correct measurement readings of the device, we
strongly recommend that you verify the voltage and current measurements,
as well as, the phase direction of the current clamps.
Summary
From the Monitoring Summary, Verify the DSP Synchronization
is On and the Phase order is 123.