User manual
10 
Installation into Panel 
1.  Refer to the drawing below. 
2.  Locate position in panel for mounting of the monitor. Assure that there 
is adequate space begin the panel. Allow extra space (0.5 in. behind and 
on each side) for air ventilation. 
3.  Cut a rectangular hole in the panel. Clean and deburr. 
Dimensions: 17.85” (454mm) W x 14.44” (367mm) H ; +/- .020” 
4.  Separate the rear collar from the unit by removing the 12 nuts. 
5.  Insert the unit into the front of the panel and re-attach the collar. 
6.  Tighten all 12 nuts to a torque of 24 inch-pounds to assure a water-tight 
seal between the poron bezel gasket on the monitor and equipment 
panel. HIS will not assume liability for damage to internal electronics 
due to improper installation. 










