User Manual

Gold Bell Installation Guide Installation
MAN-G-BELIG (Ver. 1.004)
www.elmomc.com
37
4.7. Main Power, Auxiliary Power and Motor Power
The Gold Bell receives power from main and auxiliary supplies and delivers power to the motor
that it controls.
4.7.1. Motor Power
Note: When connecting several drives to several similar motors, all should be wired in an
identical manner. This will enable the same settings to run on all drives.
Pin Function Cable
Brushless Motor Brushed DC Motor Stepper Motor
PE Protective Earth Motor Motor Motor
M1 Motor phase Motor No Connection Motor
M2 Motor phase Motor Motor Motor
M3 Motor phase Motor Motor Motor
M4 Motor phase No Connection No Connection Motor
Pin Positions
Table 9: Motor Connector
Connect the M1, M2, M3, M4 and PE pins on the Gold Bell in the manner described in Section
4.3.2.1. The phase connection is arbitrary as the Elmo Application Software (EAS) will
automatically establish the proper commutation during setup. However, if you plan to copy the
setup to other drives, then the phase order on all the drives must be the same.