Installation Guide
ellasbubbles.com
IMPORTANT: If  grab  bars  are  to  be  installed,  blocking  should  be  installed  behind  the  substrate 
before attempting  to  install  the  grab  bars  on  the  panels.  The  holes  for  the  grab  bars  should  be  pre-
drilled in the same area of the blocking prior to installing the grab bars. 
Failure to do this will cause the grab bars to come loose and could cause breakage or cracking of the 
panels. This type of breakage is not covered by Ella's Bubbles warranty.
IMPORTANT: These  panels are manufactured  with full  blocks  of tile  at the  top and bottom  of the panels. 
In order  to  keep  the  grout  lines  level;  it  will  be  necessary  to  trim  the  bottom  of  the  panel  if  the  tub/
pan  is out of level. All other cuts will be made on the top of the panel, to adjust the height of the panels. 
IMPORTANT:  To  get  the  best  possible  look  with  these  panels,  it  is  important  to  align  the  grout  lines. 
The best way to accomplish this is after the back panel has been installed and the overall measurements 
of  the side  panels  have  been  taken,  measure  from  the  tub  or  shower  base  up  to  a  grout  line  at  eye 
level  on  the back  panel.  Before  you  cut  the  height  of  the  side  panels,  measure  from  the  same  spot  on 
the  side  panels and, if needed, you can cut a little off the top and bottom of the side panels to help align 
the  grout  lines.  If  you  have  any  questions  about  this  procedure,  please  call  customer  service  at 
1
(800)480-6850(US).
Installation 
Guidelines 
The wall panels may be installed over d
rywall, plaster, painted walls, plywood, or any solid Wall, stud 
or existing tile surface. Wall surfaces must be clean, dry and free grease, dust and loose or flaky paint 
or plaster. Additional bracing to the support optional grab bars and/or seat should be installed at this 
time. Refer to the accessory manufacturer instructions for proper installation according to local 
building codes. Plan rough plumbing requirements (drain- venting- supply lines) at this time 
acco rding to local building code. Turn of water supply to bathtub, remove existing control valve 
handle(s) cover plates and filler spout. 
Prepare walls, floor and base. 
Confirm that all components have been included before beginning your installation. Floor leveling 
compound should be use under the shower base if your floor is not perfectly level. Do not screw or 
bolt the base to the floor. 
INSTALLERS NOTE: You will need to start the top of all of the panels at the exact same place so that the 
“grout joints” will meet in the corners. 
IMPORTANT:  If  installing  the  new  Ella's  Bubbles  panel  system  over  existing  tile,  make  sure  the  walls 
(substrate  and  framing) are in  good  shape  (no  water  damage,  mold  or  mildew) and  the existing 
tiles  are  not  badly  broken.  If  this  is  the  case,  then  clean  the  back  of  the  panels  with 
acetone, apply 100% silicone instead of standard construction adhesive and  adhere  the  panel  directly 
over  the  tiles.  Brace  with  a  1  x  4  or  1  x  2  scrap  until  dry  then  install  a  thicker  trim  strip  over 
exposed edges. Seal the trim all the way to the floor. 










