Rotate the pan back to the horizontal position. As
you lower the pan to the sub oor, align the drain
pipe with the drain tting, and with the pencil mark at
the front of the threshold.
When the pan is seated into the adhesive, place
the cardboard on the shower oor for protection.
Thoroughly walk around in the shower. This will assist in
seating the pan into the adhesive.
Attach the pan to the studs by installing the at top/
pan head screws through the holes drilled into the
ange. Snug the screws up tight so the screw heads
will be clear of the side wall panels for assembly.
Use care not to over tighten to the point that causes
ange breakage.
18. Before installing the walls, conrm the ledges
where the walls sit are level. Check with a long
level as shown in Figure 16. If there is an out of level
condition, remove screws and adjust as required.
19. Before the adhesive cures, conrm the oor slope
to the drain has been maintained. To do this, use a
2 foot level at various points around the drain to the
adjacent wall to check for draft. Make sure there is a
downward slope to the drain in all directions around
the drain. Visually inspect the oor to be sure there
are no humps or dips that could cause improper
drainage. See Figure 17A and 17B.
20. The next step will be to place the wall panels
on the pan. The back wall will be installed rst. If
the water control valve is in the back wall, carefully
measure and mark the location on the surface of
the wall panel. If installing in a shower with a two
piece back wall, the valve probably will be installed
through the lower wall panel. Make certain the valve
does not conict with the mounting ange or seam.
Read the installation instructions provided by the
valve manufacturer. Before the Trial t, carefully drill
the valve hole (s) in the panel. When drilled,dry Trial t
the back wall panel (s) on the shower pan to test the
t.
Conrm the gap where the wall seats to the pan is
1/8" or less. Make sure the seam for the two piece
wall is also 1/8" or less. Adjust the valve hole size and
location if required.
Lift the wall panel with the valve hole away.
Complete the valve installation and connection to
hot and cold water supply at this time. Also complete
shower supply connection. Strap pipes to framing
if required. This is the last access to the plumbing
before the wall is permanently installed.
Installation Instructions 5 of 12
www.ellasbubbles.com Page 9 06/15