Use and Care Manual
ERPBD28WSC LRPBD2_8WSC
0000001030 (Rev. G - 01/18)
Page 3
Figure 3 - LZWS-LRPB Tube Routing
1. Make water supply connections. Install a shut-off valve
and union connection to building water supply (valve and
union not provided). Turn on water supply and ush the
line thoroughly.
Caution: DO NOT SOLDER tubes inserted into the
strainer or lter head as damage to the o-rings may result.
2. Install mounting frame (instructions supplied with mounting
frame.
3. (For LZWS-LRPBM28K) Install lter bracket on chiller (Fig 9),
then install the lter head to the bracket, plumb from the lter
outlet to the chiller inlet with ¼” poly tubing and ¼ x ¼ union,
install lter.
3a. (For EZWS-ERPBM28K) Install strainer on the input tube to
the chiller (Fig 2).
4. Install chiller on shelf, install ¼ x ¼ x 3/8 Tee on chiller output
tube. Install supplied 4” poly tubing and armaex to the outlet
of the previously installed tee. Connect supplied ¼ x ¼ x ¼
tee to the 4” poly tubing. With the back panel standing close to
the frame, connect 3/8” poly tube to the bottle ller.
Note: Building construction must allow for adequate air ow
on both sides, top & back of chiller. A minimum of 4” (102 mm)
on both sides & top is required. See chiller installation for ad-
ditional instructions.
5. Hang main panel on mounting frame hanger. Make sure the
power cord, reset switch wire & poly tube do not get pinched
between the panel & mounting frame. Ensure the panel en
gages at the top. Align fountain holes with mounting frame
holes.
6. Remove protective coating from main panel.
7. Install fountains with (8) 5/16-18 HHMS, (8) 5/16-18 nuts &
(4) support brackets (provided) (Fig 4). Connect the ¼” water
lines from each fountain to the remaining openings on the tee
at the remote chiller (cut lines to t as needed), (Test t refrig-
erated panel to make sure there is a tight joint between it & the
main panel before fully tightening mounting screws.)
CHILLER
INLET
CHILLER
OUTLET
13
12
14
TO BUBBLER
12
Figure 2 - EZWS-ERPB Tube Routing
TO BUBBLER
12
13
25
12
12
CHILLER
OUTLET
WATER
INLET
REQUIRED TOOLS AND MATERIALS
These tables show special tools and/or additional materials
(not provided) which are necessary to complete installation
of these units:
Special Tools
Item
Description
Quantity
NONE
Additional Materials Not Included
Item
Description
Quantity
Unplated copper inlet pipe
Service Stop/Shut-off Valve
90° 1-1/4” Drain Line
1-1/4” Tee Drain Line
1
2
3
4
1
1
1
1
15
15
33
TO BOTTLE
FILLER
33
TO BOTTLE
FILLER