Instructions / Assembly

FOR PARTS, CONTACT YOUR LOCAL DISTRIBUTOR OR CALL 1.800.834.4816
0000001027 (Rev. C - 08/16)
Elkay - www.elkay.com
Halsey Taylor - www.halseytaylor.com
52 1/8"
1324mm
4 1/2"
114mm
37 1/2"
952mm
5/16" SCREWS OR BOLTS
(20 REQ'D - NOT FURNISHED)
FRAME
5/16" HEX NUT
(4 REQ'D - PROVIDED)
P/N 111577343890
INSTALL (2) SCREWS
(P/N 111008343890) IN FRAME
BEFORE INSTALLING IN OPENING
BOLT FRAMES TOGETHER
WITH 5/16" X 3/4" (19m) BOLTS
(4 REQ'D-PROVIDED)
P/N 111577243890
HOOK RODS (2)
P/N 101567443730
5 1/8"
130mm
BACK OF WALL
TO BE 12"
(305mm) MIN
DEPTH
8"
203mm
TO FLOOR LINE
1"
25mm
ELECTRICAL INLET
LOCATION ON CHILLER
FLOOR LINE
WOOD OR STEEL FRAME
SHOWN (NOT PROVIDED)
OPTIONAL BRACKET
FOR ACCESS PANEL
3"
76mm
10 1/4"
260mm
OPTIONAL FOR
ACCESS PANEL
MFWS210 / MFWS230 MOUNTING FRAME INSTRUCTIONS
MFWS230
FRAME
1. Cut a square rectangular wall opening 37 1/2” (953mm) W x 52 1/8” (1324mm) H and 4 1/2” (114mm) above
the oor line. These dimensions are required to obtain proper rim and bubbler heights for compliance with ANSI
standard A117.1.
2. Reinforce the wall opening on all sides so that it will adequately support the water fountain. This reinforcement
must support up to 150 lbs static load and provide a means for securing the frame assembly in place.
NOTE: Building construction must allow for adequate air ow on both sides and top of remote chiller unit.
Minimum of 4” (102mm) is required.
3. Install plumbing and electrical rough-ins. A junction box for a (3) wire, 10 amp branch circuit is provided on
the inside of the chiller. (Standard 120 Volts, 60 Hz and single phase)
4. Remove frame assembly and related hardware from packaging. Attach the two frames together thru the
upright supports with (4) 5/16” x 3/4” (19mm) long bolts and nuts (provided). Tighten securely.
5. Install the frame assembly squarely in wall opening with frame upright support edges ush with the nished
wall face. Secure the frame to the wall thru holes with (12) 5/16” bolts or screws (not provided). Tighten securely.
NOTE: Be sure that frame is squared in location. Do not use less than required screw quantity and size.
6. Attach the chiller shelf support rods to the right side frame uprights at the second set of holes counting from
the bottom and to the shelf at the (2) side holes. Line up the other shelf holes with the frame bottom holes and
fasten the assembly to the wall using appropriately sized screws or bolts and nuts (not provided).

Summary of content (1 pages)