Installation Sheet

FIG. 14
FIG. 15 FIG. 16
Page 9 1000004543 (Rev. C - 07/19)
ENLZSTL8WS_1G
1. Using a 5/16” socket, remove the (4) screws from the bottom of each cooler to
remove the wrappers.
2. Remove ller panel from cooler using a 5/16” socket.
3. Using a T20 (6-point star) bit, loosen the shroud screws on both sides of both coolers.
4. Lift the basin/shroud assembly from each cooler. Disconnect the water line from the
solenoid and the shroud wires from the wiring harness and solenoid. Set aside.
5. Unfasten the electrical harness connector from the electrical bracket.
Using a T20 (6-point star) bit, remove the electrical bracket from the mounting bracket.
Snap the electrical harness connector into the cutout of the mounting bracket with the
connector facing down. (See Fig 14.)
6. Install the electrical bracket on the lter bracket of the non-refrigerated cooler
by removing the two screws towards the front of the cooler and reinstalling them
through the bracket. Attach the female end of the bi-level extension into the
electrical bracket.
7. Only move the ller panel and J-clip to the refrigerated (right) cooler if the right
side will be mounted high.
8. Install the non-bottle ller basin on the refrigerated cooler. Connect the water line
to the solenoid and the electrical connections to the wiring harness and solenoid.
Tighten the (4) T20 screws.
9. Mount the refrigerated cooler on the right-hand hanger bracket. Secure to wall.
10. Install the bottle ller basin on the non-refrigerated cooler. Connect
the water line to the solenoid and the electrical connections
to the wiring harness and solenoid. Be certain the
electrical connector is protruding through the cutout
in the top of the basin. Tighten the (4) T20 screws.
11. Mount the non-refrigerated cooler on the left-hand
hanger bracket. Secure to wall.
12. Route the bi-level extension through the coolers and
connect to the refrigerated electrical harness mounted
in the mounting bracket (See Figs. 15 & 16).
13. Hook up the drains using the attached drain kit.
14. Make all water and electrical connections.
15. Reinstall wrappers using (4) screws for each wrapper.
CONFIGURATION INSTRUCTIONS
INSTRUCTIONS TO MOVE THE BOTTLE FILLER & BASIN TO THE LEFT SIDE
(NON-REFRIGERATED) FOR ALTERNATE MOUNTING VERSATILE BI-LEVEL
ONLY move the ller panel and j-clip
to the refrigerated (right) side if right
side will be mounted “high”
Fig. A
Fig. B
Fig. C