Instructions / Assembly

Page 4
ENLZS8WS_1G
1000004538 (Rev. A - 09/18)
FIG. 2
Secure cooler frame to wall by installing (2) screws and washers (not supplied).
Fig. 5
Fig. 4
Attach the 3/8 water line into the bulkhead tting
FIG. 3
Lay gasket along back of bottle ller mounting plate. Align BF and lay on cooler basin.