Installation Sheet

EZWS-ERPB8-RF LZWS-ERPB8-RF
0000001059 (Rev. B - 10/14)
Page 5
Figure 7 – Fountain Installation
Figure 8 – Lower Panel Installation
8
2
3
Nut
View From Rear
Nut
4,5,6,7,8
1
10. Install fountains with (4) 5/16-18 HHMS, (4) 5/16-18 nuts & (2)
support brackets (Item 3) (from original installation) (Fig 7).
Connect the ¼” water lines from the fountain to the remaining
opening on the tee at the remote chiller (cut lines to t as
needed), (Test t refrigerated panel to make sure there is a
tight joint between it & the main panel before fully tightening
mounting screws.)
11. Attach waste tubes (1-1/4” O.D.) to 1-1/4” O.D. slip trap. Trap
on the bottle ller side must be 1-1/2” O.D. (Traps and connec-
tion ttings provided by others).
12. Drill a 5/32” (.156”) diameter mounting hole in right hand frame
to secure the lower right corner of the upper panel.
• Center the hole in tab opening.
• Secure the panel to the frame with (screw from kit Item 8).
13. Make nal water supply connections. Turn on water supply,
check for leaks. Repair leaks as required.
• These products are designed to operate on 20-105 PSIG
supply line pressure. If inlet pressure is above 105 PSIG,
a pressure regulator must be installed in the supply line.
• (Caution: Any damage caused by connecting these
products to a supply line with pressure lower than 20
PSIG or higher than 105 PSIG IS NOT covered under
warranty.)
14. Make electrical connections to the bottle ller and remote
chiller. The LCD Bottle counter should illuminate. Refer to
BF11 Program instructions for additional details on Bottle Filler
setup.
15. Verify proper dispensing from the bottle ller by placing a cup,
hand or any opaque object in front of sensor area and verify
water dispenses. Note: the rst initial dispenses might have air
in the line which may cause a sputter. This will be eliminated
once all air is purged from the line. A steady stream of water
assures all air is removed. The sensor has a 20 second maxi-
mum ON time. It may be necessary to step away from the
beam a few times to purge all air. Check for leaks.
16. Reconrm the installation has no leaks. Install the lower
(louver) panel.
8 See note 12
NOTE: The following items are not used with the
converted installation:
– One Fountain Assembly
– Wall Frame - Left Side
– Upper Panel
– Lower (Louver) Panel