Installation Sheet

EZWS-ERPB8-RF LZWS-ERPB8-RF
0000001059 (Rev. B - 10/14)
Page 3
Remove left hand mounting frame, replace with new open frame (included).
BOTTLE FILLER / FOUNTAIN RETRO-FIT CONVERSION
REQUIRED TOOLS AND MATERIALS
These tables show special tools and/or additional materials
(not provided) which are necessary to complete installation
of these units:
Tools Not Provided
Description
Quantity
Safety Glasses
Gloves
Electric Drill / 5/32” Bit
Wrenches, Crescent Wrench,
Channel Lock Type Pliers
5/16” Nut Driver
Hammer / Center Punch
Sockets & Ratchet Wrench
1
1
1
1
1
1
1
1
1. Prepare for conversion. Turn off electrical power and water
supply to existing installation.
2. Disassemble the current installation see (Fig 2).
Remove existing fountains and plumbing connection lines.
Remove upper and lower panels
Remove left hand mounting frame
3. Install new mounting frame into left hand side of wall opening.
Secure mounting frame to wall opening and adjacent frame.
Use all fastener holes to secure the frame properly.
Additional Materials Not Included
Item
Description
Quantity
Unplated copper inlet pipe
Service Stop/Shut-off Valve
90° 1-1/4” Drain Line
1-1/4” Tee Drain Line
1
2
3
4
1
1
2
1
Typical current installation with fountains and panels removed.
Disassemble current Bi-Level Refrigerated fountain installation
Figure 2
Figure 3