Installation Instructions

98129C (Rev. B - 7/10)
EDF210C / EDF310C
PAGE 3
APRON OF FOUNTAIN
27
25
26
HOW TO ATTACH COVER PLATE
STEP 1.
POSITION WELD NUTS AND SCREWS AS SHOWN IN THE ABOVE PICTURE.
STEP 2.
POSITION PLATE TO BOTTOM OF FOUNTAIN KEEPING EQUAL MARGIN ON EACH SIDE.
STEP 3.
TIGHTEN SCREWS - AS SCREWS ARE DRAWN UP THE WING OF THE WELD NUT WILL
SANDWICH THE FLANGE OF THE FOUNTAIN.