Installation Sheet

16
DSWH160UVPC
Installaon and Maintenance Manual
9. Open the CO
2
valve.
1. Using a screwdriver slowly turn valve screw counterclockwise (le)
to open valve.
2. Connue unl pressure reads 50 to 58 psi max.
10. Re-purge the line for sparkling water.
NOTICE: The water will ow at at rst, then gradually
become more sparkling as the line is purged of sll water.
NOTICE: If the "No/low CO
2
" error LED ashes during this step, there is a problem with the connecon
to the CO
2
source. Check all components in the gas system before proceeding.
11. Allow machine to complete inial chilldown.
NOTICE: Complete chilling of ice bank will require around 30 minutes - 1 hour. The machine should not
be used as a water dispenser unl chilling is complete.
NOTICE: Complete water heang will require around 10 minutes. The machine should not be used as a
water dispenser unl heang is complete.