Installation Sheet

15
1000003740 (Rev. A - 02/2017)
7. Purge the water lines.
1. Place receptacle beneath tap to catch dispensed water. Discard water as necessary.
2. Allow water to run connuously unl ow is clear of air.
3. Repeat for all taps.
NOTICE: The "No/low CO
2
" error LED will ash when dispensing begins. This is correct, as the CO
2
connecon has not been acvated yet. This alarm can be ignored during this step
.
8. Turn on the boiler
NOTICE: Never turn on the boiler unless you have lled the machine with water.
NOTICE: Never turn on the boiler when the inlet water is disconnected.
1. Open the front panel with the supplied key and press the boiler buon at the top center of machine.
2. Aer around 10 minutes, the water reaches the seed temperature.
CAUTION: Hot water reaches 185°F. Keep children away. Hot, boiling water and steam will scald if
spilled on skin. Do not touch the dispensing nozzle to avoid burns.
Press dispensing
buon
DSWH160UVPC