Installation Sheet
14
DSWH160UVPC
Installaon and Maintenance Manual
5. Connect external water and CO
2
piping.
6. Plug the machine into the wall socket and turn it on.
1. Connect the power cable to the nearest socket.
2. Open the front panel with the supplied key and press the power buon at the top le of machine (B).
NOTICE: Chilling of the ice bank begins immediately when unit is turned on. Complete chilling of ice
bank will require around 30 minutes - 1 hour. The machine should not be used as a water dispenser unl
chilling is complete.
DSWH160UVPC
DSWH160UVPC
A
B
A
B
Water input
CO
2
input