Installation Sheet
14
Blubar Countertop and Fontemagna Compact
Installaon and Maintenance Manual
4. Place the machine in its operang locaon.
NOTICE: Ensure machine remains level while being lied into place to prevent spillage from ice bank.
5. Connect external water and CO
2
piping.
6. Plug the machine into the wall socket and turn it on.
1. Connect the power cable to the nearest socket.
2. On the Blubar Countertop, ip the power switch at the rear of the machine to the "I" posion. On the
Fontemagna Compact, press the power buon at the top right of the Touch Control keypad. Refer to
Components Guide on page 5.
NOTICE: Chilling of the ice bank begins immediately when unit is turned on. Complete chilling of ice
bank will require 1-3 hours. The machine should not be used as a water dispenser unl chilling is complete.
Water input
CO
2
input
Blubar Countertop Fontemagna Compact
Water input
Drip tray
waste water
CO
2
input