Installation Sheet

15
1000002475 (Rev. D - 04/2016)
9. Purge the water lines.
1. Place receptacle beneath tap to catch dispensed water. Discard water as necessary.
2. Allow water to run connuously unl ow is clear of air.
3. Repeat for all taps.
NOTICE: On the Column Tap, use the lever (A) to regulate the water ow: rotate counterclockwise to
increase the ow or rotate clockwise to decrease it.
10. Open the CO
2
valve.
4. Using a screwdriver slowly turn valve screw counterclockwise (le)
to open valve.
5. Connue unl pressure reads 55 psi to 60 psi max.
11. Re-purge the line for sparkling water.
NOTICE: The water will ow at at rst, then gradually
become more sparkling as the line is purged of sll water.
12. Allow machine to complete inial chilldown.
NOTICE: Complete chilling of ice bank will require 1-3 hours. The machine should not be used as a water
dispenser unl chilling is complete.
Open both
taps
Press and hold
dispensing buon
Fontemagna Bridge Column Tap