Installation Sheet

14
Carbonaon Chiller, Fontemagna Bridge and Column Tap
Installaon and Maintenance Manual
6. Place the supply head on the counter top.
Fontemagna Bridge
1. Use the template provided in the kit to drill the
mounng holes on the counter top.
2. Insert the inlet tubes of the supply head through
the dedicated hole and secure the unit rmly to the
surface with the (4) screws M6 - 1mm x 40mm long
and (4) M6 washers provided.
Column Tap
1. Place the valves and fully ghten the ring nuts.
Screw in the knobs on the taps.
2. Drill a 1.375’’ to 1.5” diameter hole on the counter
top.
3. Insert the inlet tubes of the tap through the
holeand secure the unit rmly to the counter top
with the nut provided.
NOTICE: If the surface thickness is above 1.45 in (40 mm), buy appropriate replacement screws in a
specialized shop (Fontemagna Bridge only).
7. Connect the supply head to the undercounter water cooler.
1. Using the 3/8” tubing supplied, cut the tubing to the desired lenght and connect the incoming water tubes to
the Carbonaon Chiller water cooler. Pay aenon to the labels on the pipes.
2. Using the insulaon supplied, wrap the chilled and sparkling water tubes to minimize condensaon.
8. Plug the machine into the wall socket and turn it on.
1. Connect the power cable to the nearest socket (Carbonaon Chiller and Fontemagna Bridge only).
2. Flip the power switch at the front of the machine to the "I" posion (Carbonaon Chiller only).
NOTICE: Chilling of the ice bank begins immediately when unit is turned on. Complete chilling of ice
bank will require 1-3 hours. The machine should not be used as a water dispenser unl chilling is complete.