Installation Sheet
13
1000002475 (Rev. D - 04/2016)
3. Fill the ice bank in your water cooler.
1. Insert piping from water supply (A) into ice bank 3/8” inlet quick connect on the front side on the machine
(B).
2. Fill slowly unl water reaches the maximum ll line on the overow tube on the back side of the machine (C).
3. If water exceeds this level, water will ow from overow (D).
4. If you have to move the unit, remember to empty the ice bank rst.
5. Turn o water supply and remove piping from ice bank inlet.
4. Place the water cooler in its operang locaon.
NOTICE: Ensure machine remains level while being lied into place to prevent spillage from ice bank.
5. Connect external water and CO
2
piping.
D
Carbonaon Chiller
Carbonaon Chiller
Water
input
CO
2
input