Installation Sheet

13
1000002475 (Rev. D - 04/2016)
3. Fill the ice bank in your water cooler.
1. Insert piping from water supply (A) into ice bank 3/8” inlet quick connect on the front side on the machine
(B).
2. Fill slowly unl water reaches the maximum ll line on the overow tube on the back side of the machine (C).
3. If water exceeds this level, water will ow from overow (D).
4. If you have to move the unit, remember to empty the ice bank rst.
5. Turn o water supply and remove piping from ice bank inlet.
4. Place the water cooler in its operang locaon.
NOTICE: Ensure machine remains level while being lied into place to prevent spillage from ice bank.
5. Connect external water and CO
2
piping.
D
Carbonaon Chiller
Carbonaon Chiller
Water
input
CO
2
input