Installation Sheet

14
Blubar Countertop and Fontemagna Compact
Installaon and Maintenance Manual
4. Place the machine in its operang locaon.
NOTICE: Ensure machine remains level while being lied into place to prevent spillage from ice bank.
5. Connect external water and CO
2
piping.
6. Plug the machine into the wall socket and turn it on.
1. Connect the power cable to the nearest socket.
2. On the Blubar Countertop, ip the power switch at the rear of the machine to the "I" posion. On the
Fontemagna Compact, press the power buon at the top right of the Touch Control keypad. Refer to
Components Guide on page 5.
NOTICE: Chilling of the ice bank begins immediately when unit is turned on. Complete chilling of ice
bank will require 1-3 hours. The machine should not be used as a water dispenser unl chilling is complete.
Water input
CO
2
input
Blubar Countertop Fontemagna Compact
Water input
Drip tray
waste water
CO
2
input