Installation Sheet

-1-
elkhome.com
1. Carefully pull house wires out of junction box so
they are easily accessible during installation.
2. Position mounting bracket (A) so threaded ends
of attached xture mounting screws (E) are
facing down towards oor.
3. Carefully pull house wires through center hole
in mounting bracket (A).
4. Align holes in mounting bracket (A) with holes
in junction box. Thread each junction box screw
(B) into holes in mounting bracket (A) and into
holes in junction box. Tighten junction box
screws (B) to secure mounting bracket (A) to
junction box.
CAUTION: Make sure house wires are pulled
completely through hole in mounting bracket.
DO NOT pinch wires between mounting bracket
and ceiling.
GND
A
B
B
E
JUNCTION
BOX
E
GND
ITEM#: 12764/8
WARNING: DISCONNECT POWER AT THE MAIN
FUSE BOX BEFORE INSTALLATION.
WARNING:
This xture is intended for installation in
accordance with the National Electrical Code
(NEC) and all local code specications. If you are
not familiar with code requirements, installation
by a certied electrician is recommended.
Before assembly, remove all parts and part
packages from box. If anything is missing, please
contact the retailer from which the product was
purchased.
5. Strip 3/4” of insulation from ends of xture
wires.
6. Slightly loosen ground screw on mounting
bracket (A). Do not completely remove ground
screw. Wrap house ground wire (copper) around
ground screw, leaving enough ground wire
to attach to xture ground wire. Twist end of
xture ground wire and end of house ground
wire (copper) together. Twist wire nut (C) onto
ends of wires. Completely tighten wire nut
(C). Reference chart below for correct wire
connections.
ANY QUESTIONS CALL: 800-613-3261
M-F 8:00AM-6:00PM ET
Français p. 4
Español p. 7
GROUND
SCREW
A
FIXTURE
GROUND WIRE
HOUSE GROUND
WIRE (COPPER)
C
Connect Supply (House) Ground Copper Wire to:
Bare Copper Wire or,
Bare Silver Wire or,
Green Insulated Wire.

Summary of content (9 pages)