Product data

electric gate operators
section 02829
PART 3 EXECUTION
3.1 EXAMINATION
A. Do not begin installation until substrates have been properly prepared. If substrate preparation
is the responsibility of another installer, notify Architect of unsatisfactory preparation before
proceeding.
3.2 PREPARATION
A. Prepare surfaces using the methods recommended by the manufacturer for achieving the best
result for the substrate under the project conditions.
3.3 INSTALLATION
A. Install in accordance with manufacturer’s instructions including the following:
1. Mount directly to concrete pad, rmly secured, plumb and level.
2. Mount to mounting pedestal; provide base plate.
3. Wire in accordance with National Electric Code.
4. Enclose all splices in easily accessible junction boxes or on terminal boards.
5. Tag and identify all cable runs in all junction boxes.
B. Test system and adjust to assure components and accessories are properly connected and in
working order.
3.4 PROTECTION
A. Protect installed products until completion of project.
B. Touch-up, repair or replace damaged products before Substantial Completion.
3.5 MAINTENANCE
A. Maintain at three-month intervals during specied maintenance period, checking external
reversing devices once per month.
END OF SECTION