User Manual

Rev.060116-D 6 www.elitescreens.com
2. Place the Suspension Bar (B) over the Hanging Bracket (A) and align with the hole as shown
below according to the height requirement for your installation area. Secure the Suspension Bar
(B) with the M6x20mmScrew (B), M6x13mmx2mmWasher (E) and the M6 Nut (F). Repeat
the process for the other side.
3. Insert the end flange piece (C) on the edge of the housing as shown below to complete the assembly.
The screen is now ready for installation.
B. Below ceiling installation instructions
Please make sure all parts listed below are included before proceeding with the installation.
Hardware Parts List for below ceiling installation
A. End Flange x 2 B. Hanging bracket x 2 C. Threaded rod x 4 D. Socket wrench x 1
E. M8x16mmx1.5mm
washer x 28
F. M8 nut x 20 G.M8 Top expanding bolt x 4 H. M8x40mm hex screw x 4
H
D
F
Push end flange piece into
housing end until it snaps in
B
A