User Manual

Rev.03192021JA www.elitescreens.com U-00202 3
Frame Assembly
Step 1: Place the included soft
padded foam sheet on a clean area
where the screen will be assembled.
Step 2: Position the pieces of the
frame on the foam sheet in the arrangement shown above.
Step 3: Insert center joint (a/b) connectors into one-half of the horizontal frame (B/C) and secure with the M4x7
screws (M) as shown in the illustration below.
Step 4: Connect the elbow joints (c/d) to the top and bottom sections of the vertical frame. Once inserted, connect
the vertical sections to the horizontal frame sections. Make sure all holes are in alignment and the frame pieces are
flush (no gaps). They should form perfect right angles.
Item
Parts List
103''
123’’
a.
Center Joints- M4 (bottom position)
2
2
b.
Center Joints-D5 (top position)
2
2
c.
Elbow Joints M4 (bottom position)
4
4
d.
Elbow Joints D5 (top position)
4
4
e.
Side cover Center Joints- M4
2
2
f.
Side cover Elbow Joints M4
4
4
g.
M4x7 Screws
24
24
h.
Spring
88
104
i.
Spring Hook
2
2
j.
wall brackets
4
4
k.
Φ5x50 Wall Screws
8
8
l.
Hollow Wall anchors
8
8
m.
M4x4 Screws
24
24
n.
Angle cover
4
4
o.
Center Support Bar
1
1
p.
White gloves
2
2
q.
Spring
4
4
b.
a.
a.
b.
c.
d.
g.
Tip: The center joint (b) with the larger diameter holes should be on top.
Tip: The elbow joint (d) with the larger diameter holes should be on top.
Foam Sheet
Foam Sheet
Foam Sheet