Specifications

PR O C E D U R E F O R IN S TA L L AT I O N ( c o nt . )
P L A C E M E N T O F M I RA C L E 1 O N G AT E
For strength purposes, the front bracket must be welded in an area that can with-
stand heavy forces. Do not weld a cross bar on just a few pickets or the pickets
will bend. Weld a cross bar across all of the pickets or weld the front bracket at
the top of the gate directly to the frame.
STEP 5: MAKE SURE THE OPERA-
TOR IS LEVEL or the operator will
not function pro p e r l y. An off - l e v e l
installation may cause the gate or
operator to fail prematurely.
STEP 4: Remove operator and fully
weld the plate and brackets top, bot-
tom and sides. CAUTION: WELDING
WITH OPERATOR IN PLACE MAY
DAMAGE THE OPERATOR.
STEP 7: Remove nut from bolt on fro n t
of operator. Fit the group - G - to the
gate. Manually move the gate open and
close. check for smooth and unobstruct-
ed movement. Fully tighten the nut.
STEP 6: Remove bolt and bushing
f r om back of operator. Fit the operator
to the pier using the hole which is the
most suited to the opening dimensions
re q u i re d .
a. Place metal bushing into the brack-
et hole you will be using.
b.
Fit operator bracket over hole with
metal bushing.
c. Use bolt and nut to secure operator to
b r a c k e t .
c.
a.
b.
BACK TO TABLE OF CONTENTS