Product Manual

5.1
Installation and operation
Contents Page No.
5.1. Installation and commissioning 5.2
5.1.1 Commissioning procedure 5.2
5.1.2 Unpacking 5.2
5.1.3 Handling the compressor 5.2
5.1.4 Site requirements 5.3
5.1.5 Ventilation and exhausting hot air 5.4
5.1.6 Electricals 5.4
5.1.7 Air pipe line 5.5
5.1.8 Oil filling procedure 5.7
5.1.9 Procedure for changing oil the compressor during service 5.7
5.1.10 Direction of rotation 5.8
5.2. Preservation for long idle storage 5.9
5.2.1 Airend 5.9
5.2.2 Motor 5.9
5.2.3 Air-oil separator tank 5.9
5.2.4 Disposal of Packing 5.9
5.3. Operating instructions 5.10
5.3.1 Safety system and interlocking Device 5.10
5.3.1.1 Discharge temperature sensor 5.10
5.3.1.2 Minimum pressure valve 5.10
5.3.1.3 Pressure relief valve 5.10
5.3.1.4 Overload relays for main motor and fan motor 5.10
5.3.2 Operation control system 5.10
5.3.3 starting the equipment 5.10
5.3.4 starting and normal operation mode 5.10
5.3.5 Unloading mode 5.10
5.3.6 Stopping 5.10
Installation and operation 5.0