Specifications
PURELAB Option-R 7/15 Operator Manual ELGA
Page 14 PURELAB Option-R 7/15 Version 4 08/07
Step 2 - Connect Electrical Supply
1. PLUG mains lead into the socket on the left hand
side of the PURELAB Option-R unit.
2. PLUG mains lead into mains socket.
Step 3 - Connect High/Low Level Switch to Reservoir
1. INSERT jack plug into the level control socket
located at rear of unit and reservoir.
Level control
Reservoir Level Connections
Mains power socket
Fuse
ON/OFF
switch
Mains power lead
Electrical Connections