User Manual
8. PROJECTS
22
A small arrow in front of the project name indicates the slot that the currently active proj-
ect is linked to.
Projects can be copied/cleared/pasted in the LOAD PROJECT and SAVE PROJECT
menus.
A lock symbol indicates the project is write protected.
8.1.3 PROJECT MANAGER
Opens the PROJECT MANAGER menu. Selecting a project in this menu and pressing the [RIGHT] arrow
key will bring up a list of commands.
CLEAR resets the project slot to a clean state.
INIT NEW initializes an empty file slot with a clean project. This operation is only available for empty
project slots.
DELETE removes the project from the slot.
RENAME opens a screen where you can rename the project.
LOAD FROM loads the selected project to the active project.
SAVE TO saves the active project to the selected slot.
TOGGLE toggles write protection on or o. Write protected projects can not be overwritten, renamed or
erased. A lock symbol indicates a write protected project.
Multiple projects can be selected and deselected by highlighting them and pressing [YES].
The slot the currently active project is linked to is indicated by a small arrow in front of the
project name.
Projects can be copied/cleared/pasted in this menu.
LOAD FROM in the PROJECT MANAGER will overwrite the active project. Be sure to save
your project before you load another.