User Instructions
Condenal
February 23, 2022
CLS-4-420-TH
5
4-20MA CURRENT MEASUREMENT SET-UP
1. Connect the two (2) 6-pin Phoenix contact
connector to available two (2) 6-pin Phoenix
connector on the CLS-4-420-TH.
2. Turn the CLS-4-420-TH on by pressing and
releasing the PWR buon on the membrane.
The orange PWR LED should turn on.
3. The CLS-4-420-TH is now ready to be paired to a Gateway. See the Gateway Operaonal Set-Up
Instrucons and Pairing a CLS-4-420-TH to a Gateway secons for preparing a Gateway and pairing
the CLS-4-420-TH to the Gateway to start broadcasts.