Assembly Instructions

FEBRUARY 11, 2022
CLS-4-420-th
17
15
Wait for few seconds for the Gauge
box to display the load current. For
previously uncalibrated gauges,
current will read approximately -1000
± 5mA. Select the Calibrate Gas Gauge
buon.
16
When calibraon is complete, a green
checkmark will appear beside the
Calibrate Gas Gauge buon. Conrm
that the reported current in the gauge
box is approximately -1000 ± 5mA.
Disable the acve load.
17
Using a mulmeter, measure the
voltage between the BAT+ and BAT-
terminals.
18
Deselect the Calibrate Current
checkboxes, Select the Calibrate Voltage
checkbox. Enter the measured voltage in
mV into the applied Voltage box.
19
Wait for few seconds for the Gauge
box to display the applied voltage. For
previously uncalibrated gauges,
current will read approximately ±5mV.
Select the Calibrate Gas Gauge buon.
20
A Green checkmark will appear beside
Calibrate Gas Gauge buon when the
process is complete.