Assembly Instructions

FEBRUARY 11, 2022
CLS-4-420-th
16
9
Select programming from the Top menu,
select the appropriate gas gauge image le,
and then select Program. A progress bar
dialog will display the programming status.
Aer that successful message will appear at
le boom corner.
10
Select Calibraon from the top menu. The
calibraon controls will be displayed in the
main window.
11
Select the CC Oset and Board Oset
checkboxes. Ensure no other boxes are
checked. Select the Calibrate Gas
Gauge buon. This calibraon process
may take up to a minute to complete.
12
A Green checkmark will appear beside
Calibrate Gas Gauge buon when the
process is complete.
13
Deselect the CC Oset and Board
Oset checkboxes. Select the Calibrate
Current checkbox. Enter -1000 into
the applied Current Field.
14
Set the acve load for 1000 mA
constant current. Enable the loaf and
conrm 1000mA ± 5mA is being drawn
from the CCA