User's Manual Part 2

175 MEGAM.O.L.E.® Help System Guide
5.4.4.3.1.1.3. Slope (dX/dY)
To add or edit Slope Value content:
1) Right-click a template cell and a shortcut menu appears.
2) Select Add Content or Edit Content from the shortcut menu and the Add or
Change a Calculation wizard appears.
When navigating through the wizard, the step list on the left uses a color key
to inform the user of the current step, steps that have been completed and
remaining steps.
Current
Completed
Remaining
3) Click Slope (dX/dY).
4) Select the Next command button.
5) Select a Slope Value.
If Slope Between Time References calculation is selected, the software
requires the user to select an established Time (X) Reference line. If one is not
established the software automatically creates one on the Profile Page Tab
Data Graph.