Specifications

Subject to changes without notice.
Scale 1:20
Dimensions mm
THAWING CABINETS TC18
ledoM
emuloV
srtl
yticapaC
sreniatnoc/steksab
tnaregirfeR
noitaropavE
erutarepmet
fothgiew.xaM
doofgnitsorfed
gk
egatloV
WkgnidaoL
spmaxaM
esahpni
sgkthgieW
gnippihS
emulov
³m
.rpmoclatottenssorg
81CT0811/1NG6a431RC°01-54
05~1032
3.05.18221331058.0
06~1032
Specification:
ledoMnoitpircseD
8005271/1NGteksaB
2105271/1NGreniatnocdetarofreP
1101S009=H,dnatss/S
Optional extras:
INSTALLATION ( see separate Installation instruction):
The cabinet should be bolted to a foundation or placed on the stand (optional extra). Make sure that the cabinet is installed in a horizontal level and
that the door closes in a proper way after.
When installation on the stand remove the legs and fasten the cabinet with screws attached. Use the feet under the stand to adjust to a horizontal level.
Make sure that the assembly stand stable, bolt the stand to a foundation.
Ø10 (3x)
Ø120
Ø94
Deatail of marine foot:
127
795
443
1
1
2
2
3
3
4
5
6
7
1250
100
37
72
193
123
292
150
1060
725
825
830
1. Cold water connection G 3/4" ext.,
water pressure 100 kPa (1 bar), min. flow
capacity 0.1 m³/h. Connected water should
be delimed. Incoming water pipe should be
fittes with a shut off valve.
2. Electrical connection
3. Drain G 3/4" ext.
Connects through a heat resistant (at least
100 °C) drain pipe with a air gap to the
floor drain or other drainage system.
4. Deliming tube
5. Selector switch, Cleaning/0/Thawing
6. Dispaly – Target temperature
7. Display – Cabinet temperature
11-502