Owner`s manual

PROGRAMMABLE WALL STATION
10 Owner’s manual
4 Initial Operation
When shipped, PWS panels have not been configured yet. The following illustration provides an overview
of the entire procedure of installing and configuring a PWS for the first time. Please also refer to the
descriptions of other connected devices in the corresponding chapters as well as the IRIS-Net™ on-line
help feature.
NOTE:
The system automatically recognizes and configures spare units (see page 18)
Power-on the central control unit and
power supply of the programmable wall
station
According to IRIS-Net, is
the CAN-Bus okay?
The PWS system is ready for operation
Transfer the configuration to the
programmable wall station
Yes
Perform a test: test all user functions
Label the frontal control unit, replace the
cover(s)
Connect all cables, configure DIP-switches
(baud rate, termination, CAN-address)
See IRIS-Net on-line help
See chapter “Hardware
Configuration”
Localize faults and
fix them
No
Screw CAN-Bus coupler and a front unit
together, connect additional front units
See chapter PWS-C,
PWS-4, etc.
Connect the control unit to PC/IRIS-Net
Have all units been
detected that are connected
to the CAN-Bus?
Yes
Localize faults and
fix them
No
Configure the programmable
wall station in IRIS-Net
Check the configuration in
IRIS-Net (“Offline Test”)