Full Spec Sheet
INSTALLATION GUIDE 
32 
STANDARD PIPELINES CONNECTION & AIR PURGING   
No dust or any other particles, air or moisture should be allowed to enter the air conditioning 
system. Careful attention should be paid when pipeline connection for outdoor unit is made. Try 
to avoid repeated curves as much as possible; otherwise damage to the copper pipes may occur. 
Suitable wrenches should be used when the pipeline connection is done so as to ensure 
appropriate torque (refer to following torque table). 
Excessive torque action might damage the joints while too little torque might lead to leakage. 
Torque based upon the wrench to be used
AIR PURGING WITH VACUUM PUMP 
1. Check that pipelines connection have been 
properly connected, remove the charging port 
cap, and connect the manifold gauge and the 
vacuum pump to the 
charging valve by service 
hoses as shown
2. Open the valve of the low-pressure side of 
manifold gauge, then run the vacuum pump. 
Vacuum the indoor unit and the connecting 
pipes until the pressure in them lowers to below 
1.5mmHG (The operation time for vacuuming is 
about 10 minutes). When the desired vacuum is 
reached, close the valve of the low pressure of 
the manifold and stop the vacuum pump. 
3. Disconnect the service hoses and fit the cap 
to the charging valve. 
4. Remove the blank caps, and fully opens the 
spindles of the 2-way and 3-ways valves with a 
service valve wrench. 
5. Tighten the blanking caps of the  2-way and 
3-ways valves, applying the above torque Table 
Copper pipe 
diam. 
Tightening torque 
Strengthened tightening 
torque 
6.35(1/4") 
160kgf.cm(63kgf.inch) 
200kgf.cm(79kgf.inch) 
9.52(3/8") 
 300kgf.cm(118kgf.inch) 
350kgf.cm(138kgf.inch) 
12.7(1/2") 
 500kgf.cm(197kgf.inch) 
550kgf.cm(216kgf.inch) 
15.88(5/8") 
 750kgf.cm(295kgf.inch) 
800kgf.cm(315kgf.inch) 