User Manual
9
ALTERNATIVE INSTALLATION FOR MINIMUM CHIMNEY
LENGTH
Do not connect the hood to the mains supply before installing it.
1. Position the hanging plate on the ceiling
and then mark the position of the screw
holes with a pencil.
Securely fix the hanging plate to the ceiling,
using the 11 x ST4 (30 mm) screws.
Please ensure that the bracket is fixed in a
way it would support the weight of the
hood. Depending on the construction of
the ceiling, alternative fixings may be
required. 6 x expansion bolts are also provided to allow fitting to concrete.
2. Calculate the length of the angle bars
according to the overall height of the hood
required. Extend the angle bars to the
required height and then fix them in
position using the 16 x M5 screws. The
angle bars must have an overlap of at least
100mm.
4. On the top of the hood unit, where the air outlet vent is located, the 2 x air
flaps should be carefully installed, bending very slightly so the lugs at each end
fit into the holes This enables the flaps to pivot upwards when the unit is in
operation, opening up the outlet fully for the air to pass through.
Please note: The small
spindles/lugs at each end of each
flap fit into the holes on the
housing, not the grooves above
them: