User Manual
7
Do not connect the hood to the mains supply before installing it .
1. Position the hanging plate on the ceiling
and then mark the position of the screw
holes with a pencil.
Securely the hanging plate to the ceiling,
using (30 mm) screws.
Please ensure that the bracket is in a way it would support the weight of
the hood.
Depending on the construction of the ceiling, alternative may be
required. 6 x expansion bolts are also provided to allow to concrete.
2. Fix the angle bars to the hanging plate, using
the 8 x M5 screws.
3. Extend the angle bars to the required height and then
them in position using the 16 x M5 screws. The
angle bars must have an overlap of at least 100mm.
4. At this point, if the unit is to be externally vented
connect the ducting hose to the hanging plate.
Then upper chimney section to the hanging
plate, using the 4 x self-tapping screws (4mm x
6mm).
Slide the lower chimney section onto the angle bars
and raise it until it sits just below the upper chimney
section.
Use the hanging hook to temporarily keep the lower
chimney section in this position, to make sure that it
4