Service manual

16-40
APPENDIX A
SM DLF 1-A.1 GB
UNIT INSTALLATION
a. Insert 4 M10 or 3/8" threads rods into the ceiling.
b. Introduce the rods through the slots of unit suspension brackets.
c. Position the shock absorbers, add washers and screw the nuts until the unit is firmly
supported.
d. In case of a gap between the unit and the ceiling, put a rubber or a neoprene sheet.
IMPORTANT The unit must be perfectly leveled
HOLES DRILLING LOCATION ON THE CEILLING FOR INDOOR UNIT
NOMINAL
CAPACITY
A B
2.5-5kW 790 565
6.72kW 1090 565
Horizontal position
Vertical position
CONTENT