Service manual
16-31
APPENDIX A
SM DLF 1-A.1 GB
Getting Started…
REQUIRED TOOLS LIST
1. Screw driver
2. Electric drill,
hole core drill (60 mm)
3. Hexagonal wrench
4. Spanner
5. Pipe cutter
6. Reamer
7. Knife
8. Gas leak detector
9 Measuring tape
10. Thermometer
11. Megameter
12. Multimeter
13. Vacuum pu mp
14. Gauge manifold
(for R-410A)
15. Torque wrench
18 Nm (1.8 kgf.m)
45 Nm (4.5 kgf.m)
65 Nm (6.5 kgf.m)
75 Nm (7.5 kgf.m)
85 Nm (8.5 kgf.m)
ATTENTION
1. Selection of the units location.
Select a location, which is rigid and
strong enough to support or hold the
unit, and select a location for easy
maintenance.
2. Do not release refrigerant during piping
work for installation, reinstallation and
during repairing a refrigeration parts.
Take care of the liquid refrigerant, it
may cause frostbite.
3. Installation work. It may need two
people to carry out the installation work.
4. Do not install this appliance in a laundry
room or humid ambient where water
may drip from the ceiling, etc.
Contents:
Installation/Service Tooling .......................4
Attached Accessories................................6
General information................................7
General precautions ...............................9
Indoor unit .............................................10
Access to the unit....................................10
Unit Installation........................................11
Drainage installation................................12
Air filtre location.......................................13
Outdoor unit ..........................................14
Unit dimensions.......................................14
Several outdoors installation ...................14
Disposal of outdoor unit condensed
water .......................................................15
Pipes connections ...............................15
Cutting and flaring..................................15
Pipe insulation .......................................15
Pipe connections to the unit...................16
Evacuation of pipes and indoor unit.......16
Electrical connections.........................17
Display Control Unit ............................20
Check list before operation.................21
CONTENT










