
Elastic Networks 2 BitStorm 1900 Installation and Testing
08-01101-01, Rev. 1.50 BitStorm 1900™ Installation and Maintenance Guide 2-69
Step Procedure cont.
9.) Secure the power harness in accordance with local office proce-
dures.
10.) Turn ON the power to the shelf from the power supply.
STOP