Specifications
Elastic Networks 2 BitStorm 1900 Installation and Testing
08-01101-01, Rev. 1.50 BitStorm 1900™ Installation and Maintenance Guide 2-51
Installation Task List
The following is a complete list of all tasks to perform. To install the
BitStorm 1900 complete each task in the order given.
Installing the BitStorm 1900
The following tasks and procedures have been provided to properly
install the BitStorm 1900 components. The installation is organized
into numbered tasks with each task containing all of the procedural
steps for completion. Complete each task in the order given and com-
plete each step for a task procedure in the order given before continuing
on to the next task.
Task # and Description Page
Task 001: Pre-Installation Checklist 52
Task 002: Installing the 19” Fan Tray 54
Task 003: Installing the BS1900 and Filter Shelves 58
Task 004: Installing the Air Baffle 63
Task 005: Installing the Circuit Packs 64
Task 006: Connecting Power to the Shelf 65
Task 007: Installing the Data Network Connection with an MIU 70
Task 008: Installing the Data Network with a Switch Card 74
Task 009: Installing Voice/Data & Filter Shelf Connections 78
Task 010: Installing Voice/Data w/Filter 66-Block Connections 85
Task 011: Installing the Data-only Connections 89
Task 012: Installing External Voice Switch Connections 93
Task 013: Configuring the MIU 95
Task 014: Configuring Remote Management 110
Task 015: Testing the BitStorm 1900 Installation 119
Task 016: Testing Voice Connectivity 122
Task 017: Testing Data Connectivity 123
Task 018: EtherLoop End-to-end Testing 124