Specifications
Elastic Networks 2 BitStorm 1900 Installation and Testing
08-01101-01, Rev. 1.50 BitStorm 1900™ Installation and Maintenance Guide 2-93
Task 012: Installing External Voice Switch
Connections
Use this procedure to connect the BitStorm 1900 lines to an external
voice facility.
Requirements
This procedure requires the following tools and materials:
• 24-jumper wires (24-AWG) for each BitStorm 1900 modem card
installed (240 wires for a full shelf)
• Cross-connect punch-down tool
"Appendix B: Cabling Specifications," on page 143 contains the speci-
fications for the cables and wiring required in this procedure.
Step Procedure
1.) Identify the existing Tip and Ring jumper connections from the
external voice facility cross-connect block to the customer-premise
equipment (CPE) cross-connect block.
2.) Verify dial tone on the existing voice facility at the CPE cross-con-
nect block for the line being rerouted.
3.) Remove the Tip and Ring jumper connections from the line.
4.) Terminate the Tip/Ring jumper wires from the cross-connect of the
external voice facility to the "Voice" side of the EtherLoop cross-
connect.
5.) Terminate the jumper wires from the CPE Tip/Ring connections to
the "EtherLoop" side of the cross-connect block.
6.) Verify the new connection by testing dial tone again at the CPE
cross-connect block.
7.) Secure all cabling in accordance with local office procedures.