Installation manual

6. Initial InstallationDiamond digital
61
6. INITIAL INSTALLATION
6.1 INSTALLATION CHECKLIST
Note The installation checklist comprises the procedures for installation and ini-
tial installation described in this manual. It is recommended to install the de-
vices with the aid of the instructions below.
Please note that the line voltage is only applied when you are expressively
requested in the checklist to do so.
After having thoroughly unpacked the equipment and checked the packings for
mains cables and other small parts, check the delivery with regard to damages
caused by transport. If you note a damage, immediately inform the forwarding
agent.
Using the packing slip make sure that the delivery is complete.
Before starting installation, read the enlosed installation instructions and be-
come familiar with the safety instructions.
Mount the control panel into a desk.
Mount the electronics box into an equipment cabinet.
Check the plug-in cards in the E-box with regard to correct position in the sup-
port frame and make sure that the plug-in cards are locked.
Set the switches and jumpers to the required operating position.
Establish the earth connection.
Make sure that the line voltage is conform with the voltage adjusted in the deliv-
ered equipment. If required, change it over to the corresponding line voltage.
Set the service power switch on control panel and E-box to position ON.
Establish Cheapernet cabling between control panel and E-box. Connect the
video input and output cables as well as the other control cables.
ATTENTION Cheapernet has to be terminated with a 50-resistor!
Connect the mains cable to the central mains distribution of the studio and
switch on power.
Check the operational functions of the switcher.
Adjust timing.