INSTALLATION
POSITIONING:
Position the LD-82 dehumidifier process dryer in the chamber as shown and
instructed (see TP 132). It is advisable to ensure that access can be made to
the process drying unit even when the entire product to be dried is in place.
The Universal Controller (UC-2) should also be positioned for ease of access
on the outside of the chamber or adjacent wall.
WIRING:
Connect the LD-82 dehumidifier process dryer to a 230V, 1 phase, 50Hz
supply as follows:-
Brown Live
Blue Neutral
Green/Yellow Earth (ground)
DRAINAGE:
Connect a 15mm inside diameter hose to the condensate outlet pipe
(positioned on the drainage tray, beneath the evaporator coil). Secure the
hose using a worm drive clip. The hose should at no point be raised higher
than the outlet pipe. Failure to observe this requirement will result in flooding
of the LD-82 dehumidifier process dryer.